Back to Careers

Deep-Tech Thermal Energy Storage

Electrical & Control Engineer

Corporate R&D Institute · 3+ years · Hands-on electrical experience required

Location: Daejeon, South KoreaDeadline: Open until filled

Mission

Implement panel ratings, electrical drawings, PLC and HMI based on the control concept and core logic set by the CTO. Your panels and logic complete the electrical control of IsoTES® demonstration plants.

Key Responsibilities

  • Size panel components: MCCB ratings, cable sizes and protection coordination
  • Prepare switchboard and control-panel drawings with EPLAN, AutoCAD Electrical or similar tools
  • Implement PLC programs based on the control concept and core logic provided by the CTO
  • Build HMI screens and implement alarms and interlocks
  • Connect sensors, transmitters, valves and VFDs and support I/O checkout and loop checks
  • Review panel-builder drawings, handle technical coordination and support site commissioning

Requirements

  • A background in electrical, electronic, control/instrumentation or mechatronics engineering, or equivalent practical expertise
  • 3+ years of practical electrical and control experience on industrial equipment
  • Experience designing or building low-voltage panels and switchboards, including breaker and cable sizing
  • Experience personally producing electrical and control drawings
  • Experience running and commissioning PLC programs on real equipment

Preferred

  • Siemens, LS ELECTRIC, Rockwell or similar PLC, HMI or SCADA platforms
  • EPLAN, AutoCAD Electrical or similar electrical drawing tools
  • Industrial communications including Modbus, PROFINET or EtherNet/IP
  • FAT, SAT, loop checks, I/O tests and on-site troubleshooting
  • Electrical design near explosion-proof or high-voltage equipment, or commissioning energy/plant equipment
  • Relevant Korean certifications such as Engineer Electricity, Industrial Engineer Electricity or Engineer Electric Work

About GIGAette

GIGAette is a KAIST spin-off deep-tech startup founded in 2023. We store industrial waste heat and renewable energy, then deliver heat, steam, chilled water and electricity at the temperatures industrial processes need.

Our core technology is IsoTES®, an isothermal thermal energy storage system. Instead of separate hot and cold tanks, a thermal boundary moves like a piston inside one tank to deliver heat at a constant temperature throughout discharge. Round-trip efficiency is over 95%.

Our headquarters, corporate R&D institute and demonstration site are in Jukdong, Daejeon. We are building two plants for different temperature ranges: a 3 MWh heat-transfer-oil plant for low- and medium-temperature waste heat, and a 0.7 MWh molten-salt plant at 550°C for high-temperature industries such as steel and aluminium. Core equipment completion is targeted for H2 2026, with full operation in early 2027.

We supplied a 1.5 MWh district-heating plant in Tsetserleg, Mongolia, verifying benefits for 188 people under KOICA CTS Seed 1. A follow-on Seed 2 project expands capacity to 6 MWh with KRW 700 million in funding and is now in local installation and commissioning. The system stores heat using entirely solar electricity to provide village heating. We are moving from proving the technology to supplying it and scaling up.

Why This Role Is Open

Why this role

The number of plants needing electrical and control implementation is growing

As demonstration plants increase, so does the work of sizing components, drawing panels and implementing PLC and HMI. The CTO helps define the control concept and core logic; we need someone to make them work on real equipment.

Your impact

Your implementation becomes the starting point for the next plant

Documented panel configurations, drawings, programs and I/O test results save the next plant from repeating the same work. Problems and improvements verified on site help us build the next plant faster.

What you get

Follow drawings through to operating equipment

Start with panel ratings and electrical drawings and continue through PLC/HMI implementation, I/O checks and commissioning. You complete real equipment in collaboration with the CTO and thermal/mechanical engineers, rather than owning all control specifications alone.

Funding secured

Total investment raised
KRW 2.1 billion
Government support secured
Approximately KRW 4.87 billion in R&D and commercialisation funding

Key Milestones

2023.05

GIGAette incorporated as a KAIST faculty startup

2024.04

KOICA CTS Seed 1 started — Tsetserleg district-heating demonstration; KRW 300 million government support

2025.04

Tsetserleg demonstration plant opened — 1.5 MWh thermal storage; 188 direct beneficiaries

2025.08

First seed investment — KRW 900 million; KRW 900 million cumulative

2025.09

Deep-Tech TIPS selected — IsoTES® development and demonstration R&D; KRW 1.5 billion government support

2025.10

KOICA CTS Seed 2 selected — notified on 27 October; KRW 700 million government support

2025.12

KOICA CTS Seed 2 started on 10 December — expanding Tsetserleg district heating

2026.04

Follow-on seed investment — KRW 700 million; KRW 1.6 billion cumulative

2026.04

Eco Startup selected — Ministry of Environment carbon reduction and CCUS; KRW 80 million government support

2026.05

KODIT Start-up NEST selected — 19th cohort, deep-tech track; accelerator with no direct grant

2026.08

Startup City Project selected — Daejeon regional startup package; KRW 290 million government support

2026.08

Follow-on seed investment — KRW 500 million; KRW 2.1 billion cumulative

2026.09

Scale-up TIPS selected — MW-scale demonstration; approximately KRW 2 billion government support

2026.09

Climate-tech top innovation award at Modu’s Challenge — startup league winner; KRW 40 million prize

Current projects

Deep-Tech TIPS
KRW 1.5 billion government support · IsoTES® development and demonstration R&D on our site
KOICA CTS Seed 2
KRW 700 million government support · Renewable-energy district heating in Tsetserleg, Mongolia
Scale-up TIPS
Approximately KRW 2 billion government support · MW-scale demonstration of a constant-temperature-output thermal battery
Startup City Project
KRW 290 million government support · Industrial waste-heat recovery/storage and carbon-free cooling demonstration
Eco Startup
KRW 80 million government support · CCUS application demonstration
Start-up NEST
Deep-tech accelerator with no direct grant

Current openings

We are hiring for these roles to build our demonstration plants. If your qualifications overlap, apply to the closest match; we can discuss a better fit during review.

Working Conditions

Location
135 Jukdong-ro, Yuseong-gu, Daejeon (HQ + corporate R&D institute)
Employment
Full-time (3-month probation, same terms)
Working hours
09:00–18:00
Travel
Domestic and international travel to fabricators and demonstration sites may be required depending on the project
Annual salary
Negotiable after interview · From KRW 60 million per year

How to Apply

Application period
Open until filled
Closing
Closes when a suitable candidate is hired
Email
hr@gigaette.com
Subject format
[Apply] ElectricalControlEngineer-YourName
Attachments
Resume (PDF) + cover letter + portfolio or anonymised project description
Portfolio
Show the equipment, your role, decisions you personally made and results (confidential information may be removed)
Recruiter
Ikje Jang (042-719-7544, hr@gigaette.com)

Hiring Process

ApplicationTechnical interviewExecutive interviewOffer, terms & referencesOnboarding

Total: about 3 weeks · Application review results are communicated individually after receipt